1 project

New build In progress

Oberösterreich, Austria · 2026

Grain intake complex: steel buildings, elevator tower and a 45 m conveyor bridge — Upper Austria

Duration
30 weeks
  • Installation
  • Commissioning
What we build

What we build — and how big

The capacity range and typical duration for each field, from our service sheets. Click a field to see only its projects.

On request

You are seeing a part. The rest — on request.

Malting plants and traders often ask us not to publish their names. For your sector we will send the full reference list, and where the owner agrees we arrange a visit to a plant in operation.

  • The reference list for your sector, with capacities and years
  • A visit to a plant in operation (where the owner agrees)
  • A call with the site manager who led a similar project
Questions

What clients ask before they choose us

Why don't you publish every project?

Many clients — malting plants and grain traders especially — prefer not to be named. We publish the projects we are allowed to and send the full reference list on request.

Can I visit one of your plants?

Yes, where the owner agrees. Tell us the type and size of plant you are planning and we will suggest the closest comparable one.

Do you also take on smaller projects?

Yes. A single dryer, two silos or an elevator upgrade follow the same process — survey, offer, installation, commissioning — just faster.

What does “what Raukler did” mean on each project?

It shows exactly what was in our contract: engineering, supply, installation, automation, commissioning, service. What we did not do is shown in grey — so you can compare like with like.

Next step

Planning something similar?

Send us the site plan or a sketch. We reply within 24 hours with what is possible and how long it takes.

  • Reply within 24 hours
  • Free first assessment of your project
  • One point of contact from design to commissioning