New malting line
Steeping, germination and kilning from the empty building to a plant ready for production.
Suited forNew production sites
Full malting line design and installation with Bühler-integrated technology.
We design and install complete malting lines and extend existing malthouses: steeping, germination and kilning, together with the grain handling, ventilation and process piping around them. As a Bühler partner, we integrate proven process technology into every line and install it with our own crews, from the empty building to a plant ready for production.

Everything from one contractor, with one point of contact, from the site layout to training your operators.
We recommend the right option once we understand your crops, volumes and site. The differences in short:
Steeping, germination and kilning from the empty building to a plant ready for production.
Suited forNew production sites
The new section is built and connected in stages; the switch-over is scheduled with your team.
Suited forMalthouses that keep producing
Elevators, conveyors, cleaning and silos for barley and malt around the process.
Suited forCompleting a malthouse with one contractor
Every plant is sized for your crops, your capacity and your site. You receive the exact technical data, models and dimensions with the offer.
From the first site visit to a plant that runs: the same team and one point of contact at every stage.
The first stage, the consultation, is free and commits you to nothing.
Book a site visitWe discuss the malt types, the capacity and whether the line is new or an extension of an existing malthouse.
We plan the process layout, the building interfaces and the integration with Bühler technology.
We coordinate the supply of process equipment, steel and piping with the construction schedule.
Our crews build the boxes, install the turners, the ventilation and the piping, and connect the handling equipment.
We commission the line step by step and train your team on daily operation and maintenance.

A malting plant needed 30 % more capacity without stopping its running line — we installed four germination boxes with turners in 22 weeks.
Upgrade
Bayern, Germany · 2023
New build In progress
Dobrogea, Romania · 2025
The new section is built alongside, connected in stages, and the switch-over is scheduled with the production team. How it is planned.
Read moreHow combined engineering experience and partnerships with process technology leaders like Bühler turn into plants that work from day one.
Read moreSteeping, germination and kilning step by step, the equipment each stage needs, grain handling, industrial versus craft malting, and what to clarify before planning a malthouse.
Read moreWe plan extensions around your production: the new section is built and connected in stages, and the switch-over is scheduled with your team.
Yes. Raukler is a Bühler partner and integrates Bühler process technology into the malting lines it installs.
Yes. We install the elevators, conveyors, cleaning and silos for barley and malt, so the whole plant comes from one contractor.
Yes. Training on the installed systems is part of commissioning, so your operators run the line independently from day one.
Send us the capacity, the malt types and the site, new or existing. We reply within 24 hours and arrange a first technical discussion.
The same team also designs and installs the rest of the plant, so everything fits together from the start.
Answers your technical questions and tells you what else we need for a quote.
Thomas WeberProject contact, Germany, Austria and international
Speaks DE · EN