Grain receiving and storage facilities, built turnkey
Intake, cleaning, drying, silos and loading, designed as one flow and installed by one team. From the first site visit to a facility your operators run on their own, anywhere in Europe.
What a grain storage facility includes
A grain storage facility, or grain base, receives the harvest, cleans and dries it, keeps it in good condition for months and loads it out when it is sold. It works only if every part keeps pace with the others: an intake that is faster than the dryer creates queues of wet grain, a silo battery without enough conveying capacity stays half used.
That is why we design the facility as one flow, from the weighbridge to the loading spout, and install it with our own crews. You have one contract, one schedule and one team responsible for the whole result.
- Weighbridge, sampling and intake pit
- Pre-cleaning and cleaning
- Grain dryer with wet and dry buffer bins
- Storage silos with aeration and temperature monitoring
- Bucket elevators and conveyors between all points
- Truck or rail loading, steel structures and halls

The parts of the facility, from one contractor
Each part is also delivered on its own. Open one for details, process and frequently asked questions.
Not sure where to start? Send us your harvest and your site.
All servicesHow grain moves through the facility
Every facility follows the same order, whatever its size. The truck is weighed and sampled, then tips into the intake pit. An elevator lifts the grain to the pre-cleaner, which removes straw, dust and impurities before they reach the dryer. Wet grain goes to a buffer bin and through the dryer; dry grain goes directly to storage. In the silos the grain is aerated and its temperature monitored until it is sold. At dispatch it is lifted again, weighed and loaded onto trucks or rail wagons.
Between these points sit the bucket elevators and conveyors. They are the part most often undersized, and the reason why a facility with enough silo capacity still cannot take in the harvest fast enough.
How to size each part
A facility is sized from the harvest peak backwards. The question is not how many tonnes you store in a year, but how many tonnes arrive on the busiest day, how wet they are and how many qualities you must keep apart.
| Part | What sizes it | The question to ask |
|---|---|---|
| Weighbridge and sampling | Trucks per hour at the peak | How long may a truck wait at the gate? |
| Intake pit and intake elevator | Tonnes per hour at the harvest peak | How many hours a day do you receive? |
| Pre-cleaner | The same rate as the intake | How dirty is the grain that arrives? |
| Dryer | Wet tonnes per day and the moisture to remove | Which crops arrive wet, and how wet? |
| Buffer bins | The difference between intake and drying rate | How many hours of intake must wait for the dryer? |
| Storage silos | Volume kept after harvest, by crop and quality | How many lots must stay separate? |
| Loading | Trucks or wagons per day at sale time | Truck only, or rail as well? |
A worked example
Take a farm or trader receiving 10,000 t in a harvest of about 15 working days. That is around 670 t per day on average, and more on the busiest days. Received over 12 hours, the average alone is about 55 t/h; with a margin for peaks, the intake line is designed for 60 to 80 t/h. If a third of that grain arrives wet, the dryer has to handle over 200 t of wet grain a day, or a buffer bin has to hold what the dryer cannot take at once. The figures for your project come from your harvest, your crops and your site, but the order of the reasoning is always the same.
We explain the reasoning in more detail in how to size a grain storage base, and the choice between silo types in flat-bottom or hopper-bottom silo.
New facility, extension or upgrade
A new facility starts from an empty plot: the layout is drawn around the truck routes, the future extensions and the connection to power, road and, where available, rail. The order of the work is set so that the intake and part of the storage are ready for the first harvest.
An extension adds silos, a second intake or a dryer to a facility that keeps working. New equipment is connected to the existing elevators and conveyors, and the switch-over is planned outside the harvest.
An upgrade replaces what limits the facility today: an elevator that is too slow, a dryer that no longer keeps pace, silos without aeration. We describe the approach in upgrading an existing grain base.
Foundations, permits and the building
Silos, elevator towers and dryers bring concentrated loads, so the foundations are designed from a geotechnical study of the site. The drawings for the building permit are part of the design, together with the steel structures, the walkways and, where the process needs one, the steel hall. Where grain dust is generated, the design includes dust extraction and explosion protection.
What we need for a first offer
- the crops you receive and the tonnage per harvest;
- how the grain arrives: by truck, by tractor and trailer, by rail;
- which crops arrive wet and how much moisture they usually have;
- how many qualities or lots you must keep separate;
- the location of the site, a sketch or the site plan, and what already exists on it;
- when the facility should receive its first harvest.
With these we propose a configuration and a first estimate. For large facilities we visit the site first.
How a project runs
-
Consultation and site visit Free
We look at your site, your crops and your harvest peak and propose a configuration.
A proposed configuration and a first estimate
-
Design
Layout, flow, foundations and technical drawings, ready for the building permit.
Drawings for the permit
-
Supply
Silos, dryers, elevators and conveyors, delivered to site in the order of installation.
Equipment on site, on schedule
-
Installation
Our own crews erect the silos and steel structures and connect the equipment.
A facility assembled and connected
-
Commissioning and training
We start the facility with your team and stay until it runs at harvest pace.
Trained operators and a running facility
The first step is free and commits you to nothing. We reply within 24 hours.
Book your free assessmentGrain storage facilities: frequent questions
Do you build the whole facility or only supply equipment?
Both. We deliver the facility turnkey (design, equipment, installation by our own crews and commissioning) or only the parts you need, alongside your other contractors.
Can the facility be built in stages?
Yes. The layout is drawn for the final size, and the first stage includes the intake and the storage you need now. Silos, a second dryer or rail loading are added later without redesigning the flow.
Can you extend a facility that is already working?
Yes. New silos, elevators or a dryer are connected to the existing equipment, and the switch-over is planned outside the harvest.
Which is better, flat-bottom or hopper-bottom silos?
Flat-bottom silos store large volumes at a lower cost per tonne; hopper-bottom silos empty completely by gravity and suit frequent changes of lot. Most facilities combine them.
Do you also handle the foundations and the permit drawings?
The foundations are designed from the geotechnical study of the site, and the drawings for the building permit are part of our design.
Where do you work?
Anywhere in Europe. Our crews travel to the site and we organise the transport of the equipment.
Planning a grain storage facility?
Send us the crops, the tonnage per harvest and a sketch of the site. We reply within 24 hours with a first configuration.
- Reply within 24 hours
- Free first assessment of your project
- One point of contact from design to commissioning
