Many grain bases do not need a new base, but one that runs faster and more reliably. The first step is not a list of new equipment; it is finding the point that holds everything else back.
Where the bottleneck is
- Intake: trucks wait at the gate although the silos have room. Usually the elevator or the intake conveyor is to blame.
- Drying: wet grain piles up and intake stops. The dryer or the buffer bins are too small.
- Distribution: grain does not easily reach every silo; long routes, spouts at the wrong angle, worn conveyors.
- Loading: loading takes longer than selling allows.
What can change
Replacing old elevators with higher-throughput ones, even inside the existing building. New conveyors on the routes that slow things down. A new dryer next to the existing silos. New silos, connected to the intake and conveyors already in place.
First measure where the grain waits. That is where the investment pays back fastest.
Without stopping the base
The work is planned outside the season or in stages, so the part that runs stays in operation. We dismantle, adapt the connections and install the new equipment in the order that stops the least.
How we start
We visit the site, look at the flow as it runs today and tell you where time is lost. The first assessment is free. Send us what you have now and what you want to achieve, and we reply within 24 hours.