Why projects work the way they do
How we approach turnkey grain and malting projects, what partnerships bring and what happens after handover, with the projects that show it.
Turnkey: one contractor from concept to commissioning
Why we manage every phase of a grain or malting project in-house, and what that changes for you on site.
Read more 1 min readEngineering expertise and partnerships, including Bühler
How combined engineering experience and partnerships with process technology leaders like Bühler turn into plants that work from day one.
Read more 1 min readSupport from design to daily operation
On-site training, material sourcing and long-term operational support, so your team is confident from the first harvest.
Read more 1 min readFlat-bottom or hopper-bottom silo: how to choose
The differences that matter in operation — cost per tonne, discharge, turnover — and why most storage bases use both.
Read more 2 min readHow to size a grain storage base
Capacity in tonnes is only the start. The intake rate at the peak of harvest is what really shapes the whole base.
Read more 1 min readSilo aeration and temperature monitoring: how to keep grain in condition
Stored grain is alive. Aeration and temperature cables tell you early what is happening inside the silo — and let you act in time.
Read more 1 min readThe bucket elevator: what sets its throughput and how to choose one
The elevator is the heart of a grain plant. Throughput, height, connections and maintenance access decide whether the plant runs or stands still.
Read more 1 min readChain, belt or screw conveyor: what fits each route
There is no “best” conveyor. There is the route, the throughput and the product — and a different type for each.
Read more 1 min readContinuous or batch grain dryer: how to choose
Harvest throughput, the number of crops and how the dryer connects to the plant decide the type — not the catalogue price.
Read more 1 min readHow a malthouse works: steeping, germination, kilning
Steeping, germination and kilning step by step, the equipment each stage needs, grain handling, industrial versus craft malting, and what to clarify before planning a malthouse.
Read more 7 min readExtending a malthouse without stopping production
The new section is built alongside, connected in stages, and the switch-over is scheduled with the production team. How it is planned.
Read more 1 min readA steel hall designed around the process, not the other way round
When the building and the equipment come from different teams, openings, platforms and loads do not match. Why we plan them together.
Read more 1 min readUpgrading an existing grain base: where to start
Queues at intake, a dryer that cannot keep up, old elevators. How to find the bottleneck and what can change without stopping the base.
Read more 1 min readTell us what you want to build. We’ll take it from there.
From the first sketch to a plant that runs: design, installation and commissioning by one team, across Europe.
- Reply within 24 hours
- Free first assessment of your project
- One point of contact from design to commissioning