When someone tells us “I want a 10,000-tonne base”, our first question is not about silos. It is about trucks: how many arrive per day at the peak of harvest and how long each one has to wait. A well-sized base is not just big enough; it is fast enough where it matters.

Three figures, not one

  • Storage capacity, in tonnes: how much you hold and for how long. It decides the number and type of silos.
  • Intake rate, in t/h: how much comes in on a hard harvest day. It decides the intake pit, the elevators and the conveyors.
  • Loading rate: how fast you load trucks, wagons or barges when you sell.

A base with large silos and a slow intake creates queues at the gate exactly in the weeks when every hour counts.

Drying is the bottleneck

If you harvest wet, wet grain cannot wait long. The dryer and the buffer bins in front of it must keep pace with intake, otherwise intake stops. That is why the dryer is sized for the daily harvest throughput, not for the storage capacity.

Size for the hardest day of the year, not for its average.

Room for later

Most bases grow. A site planned from the start leaves room for new silos, with conveyor routes and foundations placed so that the extension does not stop operations.

What to prepare

  • the crops and their moisture at harvest;
  • the total capacity and how many batches you keep apart;
  • the number of trucks per day at the peak of harvest;
  • how you ship: truck, rail or water;
  • what already exists on site.

With these we reply within 24 hours with a free first assessment and a proposed configuration.

For the whole facility, from intake to loading, as one project, see our turnkey grain storage facilities.

Related services

Projects that show it

New build

Muntenia, Romania · 2025

Pre-cleaning tower and distribution gallery above 12 silos, 150 t/h — Muntenia

Duration
18 weeks
  • Engineering
  • Installation
  • Automation
  • Commissioning
  • Service & training
New build

Bărăgan, Romania · 2021

Grain storage base by the railway: 16 silos, 24,000 t — Bărăgan

Duration
26 weeks
  • Engineering
  • Supply
  • Installation
  • Commissioning