Malt kiln upgrade: air chamber, ducts and fans — Bavaria
  1. The challenge

    A fixed shutdown window of nine weeks. Welding in confined spaces. Duct routes threaded between installations that stayed in place.

  2. What we did

    We dismantled the old chamber and built the new galvanized plenum on an anchored steel frame. Then the ducts and dampers, the two radial fans and the heat exchangers.

    We finished with air-flow measurements across the whole floor, with production already restarted.

  3. The result

    A stable drying profile across the whole floor. The shutdown closed on schedule.

What Raukler did

What was in our contract on this project.

  • Engineering: not on this project
  • Supply: not on this project
  • Installation: included
  • Automation: not on this project
  • Commissioning: included
  • Service & training: not on this project

How it went

14 weeks in total

  1. Dismantling the old chamber 1–2
  2. Steel frame and galvanized plenum 3–6
  3. Ducts and dampers 5–8
  4. Fans and heat exchangers 7–9
  5. Air-flow tests and handover, production running 10–14

Gallery

Similar projects

View all projects
Extension

Sachsen-Anhalt, Germany · 2024

Malting plant: 4 germination boxes × 75 t with turners — Saxony-Anhalt

Duration
22 weeks
  • Installation
  • Automation
  • Commissioning
New build In progress

Dobrogea, Romania · 2025

New malting plant: 5 circular germination buildings and a silo block — Dobrogea

Duration
64 weeks
  • Installation
  • Commissioning