In progress New build
Grain intake complex: steel buildings, elevator tower and a 45 m conveyor bridge — Upper Austria
A new intake for a grain trader: structures, elevator tower and conveyor bridge, erected with our own crew and crane.
- Location
- Oberösterreich, Austria
- Started
- 2026
- Duration
- 30 weeks

-
The challenge
Lifting the 45 m bridge in one go. Clay soil that turns soft after rain.
-
What we did
So far: the structures of both buildings, the cladding and the elevator tower. The bridge is pre-assembled on the ground in sections, ready for the lift.
-
The result
The project is in progress. We will publish the result at handover.
What Raukler did
What was in our contract on this project.
- Engineering: not on this project
- Supply: not on this project
- Installation: included
- Automation: not on this project
- Commissioning: included
- Service & training: not on this project
How it went
30 weeks in total
- Steel structures of both buildings
- Cladding and elevator tower
- Bridge pre-assembly and lift
- Elevators, conveyors, commissioning (planned)
Similar projects
View all projects
New build
Muntenia, Romania · 2025
Pre-cleaning tower and distribution gallery above 12 silos, 150 t/h — Muntenia
- Duration
- 18 weeks
- Engineering
- Installation
- Automation
- Commissioning
- Service & training
Extension
Banat, Romania · 2022
Tower grain dryer, 40 t/h, next to the existing silos — Banat
- Duration
- 10 weeks
- Supply
- Installation
- Commissioning
- Service & training
Upgrade
Dobrich, Bulgaria · 2022
Upgrade: bucket elevators and pre-cleaning in a 1980s building, 35 → 60 t/h — Dobrich
- Duration
- 8 weeks
- Engineering
- Installation
- Commissioning