River terminal: 85 m barge-loading conveyor, 400 t/h, installed from the water — Lower Danube
  1. The challenge

    A changing river level. Working windows between barge convoys. No quay along the full length.

  2. What we did

    From the pontoon we installed the mooring piles and the belt structure, then the belt and the telescopic loading head. Commissioning was done with the first barge.

  3. The result

    A 1,500 t barge loaded in under four hours.

What Raukler did

What was in our contract on this project.

  • Engineering: not on this project
  • Supply: not on this project
  • Installation: included
  • Automation: not on this project
  • Commissioning: included
  • Service & training: not on this project

How it went

12 weeks in total

  1. Pontoon, crane and mooring piles 1–3
  2. Belt structure 4–8
  3. Belt and telescopic loading head 8–10
  4. Commissioning with the first barge 11–12

Gallery

Similar projects

View all projects
Extension

Sachsen-Anhalt, Germany · 2024

Malting plant: 4 germination boxes × 75 t with turners — Saxony-Anhalt

Duration
22 weeks
  • Installation
  • Automation
  • Commissioning
New build

Muntenia, Romania · 2025

Pre-cleaning tower and distribution gallery above 12 silos, 150 t/h — Muntenia

Duration
18 weeks
  • Engineering
  • Installation
  • Automation
  • Commissioning
  • Service & training
New build In progress

Oberösterreich, Austria · 2026

Grain intake complex: steel buildings, elevator tower and a 45 m conveyor bridge — Upper Austria

Duration
30 weeks
  • Installation
  • Commissioning

Planning something similar?

Request a similar project