A selection of our projects
Most of our projects are covered by confidentiality agreements. From those we are free to show, here are the ones we are proud of — each with its figures, the type of work and what our contract covered.
Of the 400+ projects we have delivered in 30+ countries, here is a selection of 10. · 2021–2026
5 projects
New build In progress
Dobrogea, Romania · 2025
New malting plant: 5 circular germination buildings and a silo block — Dobrogea
- Duration
- 64 weeks
- Installation
- Commissioning
New build
Muntenia, Romania · 2025
Pre-cleaning tower and distribution gallery above 12 silos, 150 t/h — Muntenia
- Duration
- 18 weeks
- Engineering
- Installation
- Automation
- Commissioning
- Service & training
Extension
Banat, Romania · 2022
Tower grain dryer, 40 t/h, next to the existing silos — Banat
- Duration
- 10 weeks
- Supply
- Installation
- Commissioning
- Service & training
New build
Bărăgan, Romania · 2021
Grain storage base by the railway: 16 silos, 24,000 t — Bărăgan
- Duration
- 26 weeks
- Engineering
- Supply
- Installation
- Commissioning
New build
Dunărea de Jos, Romania · 2023
River terminal: 85 m barge-loading conveyor, 400 t/h, installed from the water — Lower Danube
- Duration
- 12 weeks
- Installation
- Commissioning
What we build — and how big
The capacity range and typical duration for each field, from our service sheets. Click a field to see only its projects.
-
Grain Silos
Custom-capacity flat-bottom and hopper-bottom silos for all grain types.
4 projects -
Bucket Elevators
Bucket elevators for vertical grain transport, high-capacity and low-maintenance.
4 projects -
Malting Lines
Full malting line design and installation with Bühler-integrated technology.
3 projects -
Conveyors
Belt, chain, and screw conveyors for efficient horizontal material handling.
7 projects -
Grain Dryers
High-efficiency continuous and batch grain dryers to preserve quality post-harvest.
1 project -
Industrial Halls
Custom steel industrial buildings designed for agricultural and processing operations.
2 projects
You are seeing a part. The rest — on request.
Malting plants and traders often ask us not to publish their names. For your sector we will send the full reference list, and where the owner agrees we arrange a visit to a plant in operation.
- The reference list for your sector, with capacities and years
- A visit to a plant in operation (where the owner agrees)
- A call with the site manager who led a similar project
What clients ask before they choose us
Why don't you publish every project?
Many clients — malting plants and grain traders especially — prefer not to be named. We publish the projects we are allowed to and send the full reference list on request.
Can I visit one of your plants?
Yes, where the owner agrees. Tell us the type and size of plant you are planning and we will suggest the closest comparable one.
Do you also take on smaller projects?
Yes. A single dryer, two silos or an elevator upgrade follow the same process — survey, offer, installation, commissioning — just faster.
What does “what Raukler did” mean on each project?
It shows exactly what was in our contract: engineering, supply, installation, automation, commissioning, service. What we did not do is shown in grey — so you can compare like with like.
Planning something similar?
Send us the site plan or a sketch. We reply within 24 hours with what is possible and how long it takes.
- Reply within 24 hours
- Free first assessment of your project
- One point of contact from design to commissioning